Exploration of Vessel Capabilities and its Impact on Floating Offshore Wind Installation Using Multi-Agent Simulation
This research addresses the increasing importance of Floating Offshore Wind in Japan with the goal of reducing offshore construction costs, which account for approximately 30% of the total project cost. The main objective is to quantitatively evaluate how differences in construction vessel capability and installation work procedures affect construction efficiency, thereby proposing better directions for construction vessel selection and construction strategies for future projects. The methodology involves analyzing AIS data (time, location, speed) of vessels used in prior projects (Hywind Tampen, Kincardine, Wind Float Atlantic) and meteorological data (ERA5 reanalysis data). The analysis of AIS from past FOWT projects allowed for the detailed breakdown of work tasks, estimation of required time, and identification of necessary vessel capabilities. A Multi-Agent Simulation (MAS) model was then constructed to account for uncertainty in weather and work time, as well as the cooperation between multiple vessels during offshore construction. The model's validation, using AIS performance data from Kincardine and WFA projects, showed an error of approximately 10% or less in the total installation time of mooring lines, confirming its ability to express the variability in work time. Initial simulation results from a case study focusing on pre-lay of mooring lines highlight the impact of specific vessel capabilities. Relaxing wave height restrictions from 1.0 m to 2.0 m reduces the work period, but relaxation beyond 2.0 m shows no further benefit in this sea area. When comparing cost and work time among vessels with different performance levels (BP, DP, ROV), vessels without an ROV tended to deviate from the optimal solution, suggesting that ROV capability may be the highest priority among the three performance parameters. Furthermore, a lack of either BP capability or ROV capability led to an extension of the work period through the deployment of support vessels. Further results on cable installation model and hook up operation, and examining the results across all entire offshore construction phases will be discussed. The research will also explore the tradeoff between cost estimations and construction period under explore various scenarios, such as the Akita demonstration project, to determine the optimal vessel performance and composition for future projects.
Presenting Author: Ryota Wada The University of Tokyo
Presenting Author Biography: Ryota received his Ph.D. in Environmental Studies from the University of Tokyo in September 2013. After completing his Ph.D., he continued research at the University of Tokyo on the topic of ocean engineering. He has been on various research projects which include extreme wave analysis, digital drilling, and subsea line structures. He spent a year at Massachusetts Institue of Technology to expand his research area to systems engineering applied to offhsore wind, methane hydrate, CCS, etc. Now, he is an Associate Professor at the the University of Tokyo.
Authors:
Yoshiki Marumiya The University of TokyoRyota Wada The University of Tokyo
Haruki Yoshimoto Japan Marine United Corporation
Hideyuki Suzuki The University of Tokyo
Exploration of Vessel Capabilities and its Impact on Floating Offshore Wind Installation Using Multi-Agent Simulation
Submission Type
Technical Paper Publication