Impact Assessment of Inspection Duration and Service Vessel Requirements for Floating Offshore Wind Farms
Offshore wind (OW) has emerged as a critical technology for achieving carbon neutrality following the signing of the Paris Agreement on global climate change. While fixed OW turbines have been deployed—at commercial scale, mainly in Europe and China. In contrast, research and development on floating offshore wind turbines (FOWTs) is ongoing, as optimal combination of components, such as floating substructures, mooring lines, and anchors, has yet to be fully validated. Recent projects have deployed between 3 and 11 FOWTs, representing the scale of a small floating OW farm (FOWF). To commercialize FOW technology, operation and maintenance cost, OPEX which accounts for almost 30% LCOE would be expected to be reduced by inspecting effectively the FOW facility that increases several GW orders annually. OPEX can be divided into scheduled inspection, unscheduled inspection, and other costs. Accurately estimating scheduled inspection costs requires evaluating inspection duration, which depends on vessel charter time.
This paper proposes a model to estimate total scheduled inspection duration and the number of required Crew Transfer Vessels (CTVs) and Service Operation Vessels (SOVs) for FOWFs. The model, based on the work breakdown structure, extends a previously developed installation-time framework. Inspection duration can be defined as multiplying the actual unit-inspection time without weather downtime by the number of repeated works divided by the operation windows. The number of CTV and SOV can be estimated by the inspection duration divided by the working days in one year. Using the inspection data from Fukushima floating offshore wind farm demonstration project and Hywind Scotland, actual unit-inspection times can be estimated and compared. Additionally, total inspection duration and CTV and SOV requirements were estimated with change the distance from the O&M port, the number of FOWTs, and weather conditions assuming a FOWF model.
The model offers a generalized framework for estimating inspection duration and CTV and SOV requirements of FOWF. It can qualitatively assess the impact of new technologies and contribute to the formulation of technology development policies for FOWF operation and maintenance strategy, such as setting a specific target for technology advancement.
Presenting Author: Tomohiro Hasumi National Maritime Research Institute
Presenting Author Biography: Graduated from department of applied physics, Waseda University on 2009.3
Worked at Mizuho Information and Research Institute, Inc, until 2022.3
Worked as a senior researcher at National Maritime Research Institute Japan from 2022.4
Worked as a principal researcher at National Maritime Research Institute Japan from 2024.4
Worked as a leader of offshore wind power project team at National Maritime Research Institute Japan from 2025.3
Authors:
Tomohiro Hasumi National Maritime Research InstituteKen Haneda National Maritime Research Institute
Yujiro Wada National Maritime Research Institute
Tsuyoshi Matsuo National Maritime Research Institute
Takeshi Yokoi National Maritime Research Institute
Sotaro Masanobu National Maritime Research Institute
Impact Assessment of Inspection Duration and Service Vessel Requirements for Floating Offshore Wind Farms
Submission Type
Technical Paper Publication